RECENT DESIGN EXPERIENCE

Client / Location
Project Description
Project Cost
Year Completed
Semiconductor Manufacturer Houston, Texas Work included troubleshooting for existing heavy metals removal system and design of an upgraded facility. Const. Cost: $350,000
Design Fee: $60,000
2008
Govt. Facility Amarillo, Texas Pilot testing, design and installation of a 300 gpm hexavalent chrome ion exchange removal system with offsite regeneration. Const. Cost: $225,000
Pilot Cost: $25,000
Design Fee: $10,000
2006
Govt. Facility Amarillo, Texas Pilot testing, design and installation of a 300 gpm boron and strontium ion exchange removal system with offsite regeneration. Const. Cost: $600,000
Pilot Cost: $11,000
Design Fee: $14,000
2005
Semiconductor Manufacturer     Dallas, Texas Redirection of 150 gpm sanitary sewer to a new discharge point into the city main. Approximately 250 of new 8 inch lines and structures. Const. Cost: $75,000
Design Fee: $10,000
 2004
Govt. Facility Amarillo, Texas  Design of a treated groundwater pumping station, conveyance line with road crossing and injection well system. Const. Cost: $868,350    Design Fee: $75,000  
Pharmaceutical Manufacturer Carrollton, Tx Design of a 50 gpm wastewater treatment system for the removal of suspended solids and oil.  Const. Cost: $50,000
Design Fee: $3,000
2004
Semiconductor Manufacturer     Dallas, Texas Upgrade of a 4,000 gpm pH neutralization facility. Included replacement of wastewater piping system and installation of groundwater monitoring. Const. Cost: $250,000
Design Fee: $17,500
2003
Semiconductor Manufacturer     Dallas, Texas Upgrade of a 4,000 gpm pH neutralization facility. Included relining basins and installing new chemical delivery system and controls.  Const. Cost: $1,250,000
Design Fee: $85,000
2002
Govt. Facility Amarillo, Texas Design and installation of a nitrogen generation system to supply 10 scfm of nitrogen gas for injection into a groundwater remediation system.  Const. Cost: $125,000
Design Fee: $10,000
2001
Semiconductor Manufacturer     Dallas, Texas Design of mechanical systems to support the installation of a 125 gpm heavy metal, ion exchange removal system.  Const. Cost: $350,000
Design Fee: $30,000
2001
Semiconductor Manufacturer     Dallas, Texas Commissioning of a 2,000 gpm pH neutralization facility.
 
 Commissioning Cost: $75,000 2001
Semiconductor Manufacturer     Dallas, Texas Waste Solvent Tank Certification
 
Design Fee: $8,000 2000
Fiberglass Manufacturer   Wichita Falls, Tx Pilot test of physiochemical process for the removal of seizing from wastewater.
 
Pilot Cost: $10,000 2000
Semiconductor Manufacturer     Dallas, Texas Installation of new reagent delivery system for a 300 gpm pH neutralization facility.  Const. Cost: $125,000
Design Fee: $13,000
1999
Automotive Manufacturer   Mexico Characterization of wastewater and design of a 75 gpm wastewater treatment system for the removal of suspended solids and oil. Const. Cost: $850,000
Design Fee: $105,000
1999
Aerospace Manufacturer Arlington, Tx Design, installation supervision and start-up of a 15 gpm cyanide destruct system. Const. Cost $500,000
Design Fee: $35,000
1999
Semiconductor Manufacturer FarmersBranch, Tx Installation of a new 20 gpm pH neutralization facility. Const. Cost: $120,000
Design Fee: $15,000
1998

| Home | Company Information | Services | Experience | Newsletter | Mail | Employment|

Caldwell Engineering, Inc.

 

P.O. Box 851325                                                                                                               (972) 889-7200

Richardson, TX 75085                                                                                            Fax: (972) 889-8332

©2010 Caldwell Engineering Last Updated: 3/1/10

If you have problems with this page, comments, or questions please email us.